Five basic tasks in SCADA system
• Input/output task
This program is the interface between the control and monitoring system and the plant floor.
• Alarm task
This manages all alarms by detecting digital alarm points and comparing the values of analog alarm points to alarm thresholds.
• Trends task
The trends task collects data to be monitored over time.
• Reports task
Reports are produced from plant data. These reports can be periodic, event triggered or activated by the operator.
• Display task
This manages all data to be monitored by the operator and all control actions requested by the operator.
- 249 reads